My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-19_REVISION - M1987026 (31)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987026
>
2022-07-19_REVISION - M1987026 (31)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2025 6:28:09 AM
Creation date
7/19/2022 3:22:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987026
IBM Index Class Name
Revision
Doc Date
7/19/2022
Doc Name Note
BLM Environmental Assessment
Doc Name
Adequacy Review Response #3
From
Colorado Quarries Inc
To
DRMS
Type & Sequence
CN1
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bureau of Land Management Environmental Assessment <br /> Royal Gorge Field Office DOI-BLM-CO-F020-2020-0036 EA <br /> Brought Considered, <br /> Issue statement(question) but further Resource <br /> Program area w,/impact-causing element forward <br /> No Reason there is no issue or that specialist Date <br /> (in alphabetic order) for deemed issue further analysis is unnecessary name <br /> analysis <br /> unnecessary <br /> How would the new proposed The proposed project area is <br /> Black Obsidian Mineral X surrounded by private land so has no L Skinner 7/16/2020 <br /> Recreation Materials Contract affect public access.There would be little to <br /> Recreation? no effect to recreation. <br /> The proposed mineral material <br /> contract site is mainly located on <br /> Sandy loam soils with low to moderate <br /> slope gradient ranging between 3 to 20 <br /> %with low erosion Factor(K), <br /> indicating the soil type is less <br /> susceptible to sheet and rill erosion by <br /> water.Existing road to access the site <br /> will be used except some realignment <br /> that will only cause little disturbance <br /> to the soil. Proposed mining and <br /> How would the new proposed related activities will cause <br /> Black Obsidian Mineral disturbance to soils within the <br /> Soils Materials Contract affect soil X proposed project site,but with the N.Tedela 06/04/2020 <br /> health to meet Standard-I? application of BLM and Applicant <br /> Project Design Features(PDFs)and <br /> BMPs(including structure removal, <br /> re-grade/re-contour,and revegetation <br /> activities that are indicated in the <br /> proposed action),the impacts caused <br /> by future mining activities will be <br /> minimized or avoided.Therefore,the <br /> proposed action will not create a <br /> potential significant impact to soil <br /> health.PDF:Minimize off-road <br /> travel while performing and <br /> supervising the operations. <br /> 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.