Laserfiche WebLink
Pit floor—5.7 ac, drill 1900/ac 5.7 ac 10830.00 <br /> Topsoil stockpile area—1.3 ac, drill 1900/ac 1.3 ac 2470.00 <br /> Onsite roads,temporary—0.7 ac, drill 1900/ac 0.7 ac 1330.00 <br /> Reseeding(assume 30%failure rate of 111 seeding, plus mulch/fert) 14.5 ac 8538.00 <br /> Weed control: <br /> Monitoring entire permit and spot treatments, 3x during final reclamation <br /> (assume 3 yrs,total of 2.0 ac, spot treatment,ATV w spray attachment) 2000.00 <br /> Mobilization/demobilization of equipment: <br /> Equipment mobilized from Salida, 50 mi one-way,40 mph avg, 3 hrs each round trip <br /> Tractor/trailers,flatbeds, lowboys, 10-yd dumps(roadable) 3600.00 <br /> Total of direct reclamation costs: 121,364.00 <br /> Indirect costs(20%of direct costs: Contractor's O/P, DRMS contract admin,etc.) 24,273.00 <br /> Total reclamation costs: $145,637.00 <br />