My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-19_REVISION - M1987026 (11)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987026
>
2022-07-19_REVISION - M1987026 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 9:48:01 PM
Creation date
7/19/2022 3:07:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987026
IBM Index Class Name
Revision
Doc Date
7/19/2022
Doc Name Note
Exhibit D - Mining Plan
Doc Name
Adequacy Review Response #3
From
Colorado Quarries Inc
To
DRMS
Type & Sequence
CN1
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rpp�o.,, <br /> Black Obsidian Pit—Permit M-1987-026 �9 L`� <br /> 112c Conversion Application (rev 07/11/22) <br /> Rule 6.4.4 DIVISION OF RECLAMATION <br /> Exhibit D MINING AND SA <br /> Mining Plan TY <br /> Introduction <br /> Current operations consist of a small surface quarry operation contained within a 9.0-acre permitted <br /> (110)area;the surface quarry area itself occupies approximately 3.0 acres. Obsidian is the only product <br /> that is mined and exported from the site. The known extent of the obsidian deposit being quarried <br /> extends beyond the existing quarry area,and extends to a much larger area of land outside the 110 <br /> permit. The thickness of overburden lying above the top of the known obsidian deposit ranges from <br /> zero feet(i.e., obsidian visible in surface outcrops)to approximately 40 feet deep(as determined <br /> through mining and exploratory drilling). In many places the known vertical thickness of the obsidian <br /> deposit has been found to be greater than 100 feet. <br /> The operator wishes to expand the permitted acreage in order to be able to access and extract <br /> additional obsidian deposits for the following reasons:to extend the life of the mine,to increase the <br /> annual production of the mine, and investigate additional markets for this unique material. The <br /> expanded area will allow an increased rate of production,yet still extend the life of the mine several <br /> more decades. <br /> In this conversion,the operator wishes to expand permit area and the existing quarry operation onto <br /> contiguous land,to the north, east, and southeast. <br /> Please refer to the Exhibit C maps,which depict the existing 110 permitted area and 112c permitted <br /> area boundaries, and the various areas of proposed activities. The maps depict the existing 110 <br /> operation,the expanded 112c operation,and significant structures. The maps show the ownership of <br /> surface and minerals,within BLM-managed land and privately-owned (patented) land. <br /> There is a 9.50-acre 110 permit adjoining and partially overlapping the proposed 112c expansion of the <br /> Black Obsidian Pit. The Lucky VI Quarry(Buffalo Hunter Lode—Sharp Lode) is permit M-2016-015, <br /> operator Ed Lyons. Approximately 3.16 acres of the Lucky VI Quarry permit(on the Sharp Lode) lies <br /> within the proposed Black Obsidian expansion area, along the southeastern boundary. Please refer to <br /> the maps in Exhibit C showing the boundary locations. Colorado Quarries wishes to include this 3.16- <br /> acre overlap area in its 112c expansion due to the shallow obsidian deposit present there,which is not a <br /> desired commodity for the present operator of the Lucky VI Quarry permit. Colorado Quarries has been <br /> in discussion with Mr. Lyons, with the intention of including the 3.16-acre area in the 112c permit, <br /> through a release request of the Sharp Lode portion. This partial release request will be filed separately <br /> in the near future so that it can be approved and effective upon the approval of the 112c expansion. <br /> This 112c permit conversion application is preceded by an approval given by the BLM Royal Gorge Field <br /> Office,for the expansion of the obsidian quarry operation onto the specific areas included in this <br /> conversion. That approval by BLM includes the legal right-of-entry given to Colorado Quarries for those <br /> lands and minerals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.