Laserfiche WebLink
IAAMM�L <br /> Office(303)688-6611 6374 S. Racine Circle, Centennial, Colorado 80111 <br /> Fax(303)688-6685 <br /> www.castiorockconstructionco.com <br /> Noxious Weed Management Plan <br /> Sites: Orton Borrow Pit and Golden Eagle Ranch Batch Plant <br /> Duration of Disturbance: 2 years <br /> Total Area of Disturbance: Approximately 20 Acres <br /> Purpose of Plan: To prevent the spread or development of noxious weeds during mining operations and <br /> following the restoration of the site. <br /> Planned Actions: <br /> l. An inspection will be conducted prior to topsoil stripping to verify the absence of noxious weeds. <br /> If present the site shall be sprayed for weeds prior to stripping. <br /> 2. Following final seeding an inspection will be conducted alongside the required quarterly storm <br /> water inspection to check for any noxious weeds, if noxious weeds are present the pit will be <br /> sprayed for weeds in the next 30 calendar days. <br /> Prepared By: <br /> Travis Bell <br /> General Superintendent, Castle Rock Construction Company <br />