My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-29_PERMIT FILE - C2010089 (13)
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2022-04-29_PERMIT FILE - C2010089 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2022 5:57:05 PM
Creation date
7/13/2022 5:55:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
PERMIT FILE
Doc Date
4/29/2022
Doc Name
Operation Plan
Section_Exhibit Name
Section 2.05.3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 2.05.3 Page 3 December 2021 (RN-02) <br />was performed based on chemical and physical core data contained in Section 2.04.6, and <br />discussions presented in Section 2.05.4(2)(d). <br /> <br />After the upper coal seam was removed, the parting material composed of alternating layers of <br />sandstone, shale or clay was be removed. Partings and interburden material ranged in thickness <br />from a few tenths of a foot to approximately 12 feet. The thinner partings were removed by loader <br />or dozer and hauled or pushed into an adjacent mined out pit. The thicker partings and interburden <br />were dozed into a mined out pit or excavated by the shovel and trucks and hauled to a mined out <br />pit. After the overburden or parting was removed above each individual coal seam, a dozer, loader <br />or motor grader cleaned off any overburden or parting material remaining on top of the coal. <br />Dozers were used to rip or break up the coal as necessary prior to loading. Once a truck was loaded, <br />the coal was transported off permit approximately eight miles to the power station. <br /> <br />The Colorado Cooperative Company’s Ditch (Second Park Lateral) was temporarily diverted into <br />a large HPDE pipeline to facilitate mining the area of the permit where the current ditch cross the <br />permit area. Once mining and reclamation activities were complete the Second Park Lateral was <br />reconstructed in an HDPE pipeline in the same location as the pre-mine ditch. <br /> <br />2.05.3(3) Mine Facilities <br />Please see a separate section devoted for 2.05.3(3) Mine Facilities. <br /> <br />2.05.3(4) Ponds, Impoundments, Other Treatment Facilities and Diversions <br />Please see a separate section devoted for 2.05.3(4) Ponds, Impoundments, Other Treatment <br />Facilities and Diversions. <br /> <br />2.05.3(5) Topsoil <br />Please see Section 2.05.4(2)(d) Overburden and Topsoil Handling for a discussion of Topsoil as <br />required by 2.05.3(5). <br /> <br />2.05.3(6) Overburden <br />Please see Section 2.05.4(2)(c) Backfilling and Grading for a discussion of overburden as required <br />by 2.05.3(6). <br /> <br />2.05.3(7) Coal Handling Structures <br />No coal crushing or processing occurred at NHN. <br /> <br />2.05.3(8) Coal Mine Waste and Non-Coal Processing Wastes <br />There were not any coal processing facilities at the NHN permit area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.