My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-01_REVISION - M1982155
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982155
>
2022-07-01_REVISION - M1982155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2025 2:59:27 AM
Creation date
7/5/2022 8:33:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982155
IBM Index Class Name
Revision
Doc Date
7/1/2022
Doc Name
Request for Technical Revision
From
Schmidt Construction Company
To
DRMS
Type & Sequence
TR3
Email Name
TC1
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEED MIXTURE <br /> Species Rate (lbs PLS/Acre) <br /> Intermediate Wheatgrass 1.5 <br /> Green Needlegrass 1.5 <br /> Blue Grama 0.5 <br /> Sideoats Grama 0.5 <br /> Little Bluestem 0.25 <br /> Western Wheatgrass 1.5 <br /> Cicer Milkvetch 0.5 <br /> Rates are for DRILL SEEDING <br /> (Broadcast seeding is not recommended,but if done then <br /> double the seeding rate for all Species <br /> (Very Important Note: This seed mix ALSO replaces the final reclamation seed mixes in the <br /> Amendment 3 area to the west of Charter Oak Ranch Road. That area will have the same kind of <br /> reclamation environment as this portion of the permit.) <br /> Management of the Reclamation <br /> Management of the reclaimed land is very important, especially for the first year or two. <br /> Adaptive Management techniques will be used here rather than Active Management which is more <br /> applicable for land that will have more domesticated uses rather than land like grazing and/or wildlife <br /> habitat which is more natural in character. Adaptive management involves vigilant watching to see <br /> what happens and then applying corrective treatment if the development of the reclaimed land veers <br /> off in some undesirable direction. Then the manager only does what is necessary to bring it back"on <br /> course." <br /> EROSION CONTROL: This primarily applies to the 3:1 slopes. The floor of the pit would <br /> not be very prone to erosion, but even there a very large and wet thunderstorm can happen that causes <br /> some erosion. <br /> Fountain Pit Technical Revision#3 - June 2022 M-1982-155 Reclamation Plan Page 19 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.