My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-01_REVISION - M1982155
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982155
>
2022-07-01_REVISION - M1982155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2025 2:59:27 AM
Creation date
7/5/2022 8:33:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982155
IBM Index Class Name
Revision
Doc Date
7/1/2022
Doc Name
Request for Technical Revision
From
Schmidt Construction Company
To
DRMS
Type & Sequence
TR3
Email Name
TC1
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
colo <br /> COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> **1876*k 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 REC ER7I <br /> REQUEST FOR TECHNICAL REVISION(TR)COVER SHEET <br /> JUL 012022 <br /> 1982-155 Fountain Pit DIVISION OF REUi,;V,,00N <br /> File No.: M- Site Name: MINING MID SAFETY <br /> County El Paso TR# (DRMS Use on1y) <br /> Permittee: Schmidt Construction Company <br /> Operator(If Other than Permittee): TR-3 <br /> Permittee Representative: M a rk H @ if n @ r TC 1/MAC <br /> Please provide a brief description of the proposed revision: <br /> Update and modernize the 36 year old permit to include new aspects not previously known or <br /> addressed at the time of permitting. <br /> As defined by the Minerals Rules, a Technical Revision(TR)is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time,in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however,it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request,including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials,and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(1, 2 or 3) $1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.