<br />Page 10 of 14 <br />ITEM 3.3 – ROAD EROSION CONTROL <br /> <br />The Contractor will provide and place biodegradable straw wattles along the downslope shoulder of the <br />access road. Additional straw wattles may be required as necessary at the direction of the PROJECT <br />MANAGER. Straw Wattles must be installed according to Section 22.3 of the 2009 General Bid <br />Specification. An estimated 3,000 linear feet of straw wattles will be used for this project. <br /> <br />Acceptable straw wattles will be manufactured from rice or certified noxious weed free agricultural <br />straw, and must be wrapped in tinsel (wood based) netting. The wattles must be a nominal nine (9) <br />inches in diameter with a weight of at least thirty (30) pounds per twenty‐five (25) foot length. Triton <br />Environmental 9" Straw Wattles, logs/Restoration logs or approved equivalent must be used. Wattles <br />will be installed on contour in trenches that are a minimum three inches (3”) in depth and nine inches <br />(9”) wide. Wattles will be anchored in the trench by ¾” x ¾” by 24” stakes on four foot (4’) centers. The <br />ends of adjacent wattles must be butted one to another. Wattles must be certified weed free. <br /> <br />If impaired, the Contractor shall take action within 24‐hours of identifying the deficiency to repair the <br />sediment control structures. Split or torn segments shall be repaired or replaced. Broken or split stakes <br />shall be replaced. Locations where rills and other evidence of concentrated runoff have occurred beneath <br />the segments shall be corrected. <br /> <br />Sediment controls will be left in place following completion of the project unless directed to be removed <br />by the Project Manager. <br /> <br />Measurement for Payment <br /> <br />Measurement will be by the lineal foot of straw wattle installed. Project Manager will measure the <br />lineal feet of straw wattle installed and accepted, and report the measured footage to Contractor. The <br />price bid shall include all costs for labor, materials, equipment and all other items necessary for <br />installation of the straw wattles as described in these specifications. Payment will be made only for the <br />unit price bid in Item 3.3 of the Bid Schedule, and as work is completed and accepted by Project <br />Manager. <br /> <br /> <br />ITEM 4.0 – VEGETATION CLEARING <br /> <br />The vegetation, including all trees, stumps, logs, shrubs, grass, weeds, fallen timber and other surface <br />vegetation, in a two acre area outlined by the Project Manager will be removed to mitigate the potential <br />for catching fire. All vegetation, including roots if possible, will be completely removed for 50 feet in all <br />directions from any vent. Woody vegetation, such as trees and stumps, will be cut to the surface of the <br />ground in the 50 foot area surrounding the vents. Vents will be identified by the Project Manager. If an <br />unmarked vent is encountered, the Project Manager must be notified immediately. Any vegetation that <br />is within the two acre area that is beyond 50 feet from a vent will be cut to the surface of the ground and <br />the roots may remain in place. Woody vegetation, such as trees and stumps, will be cut to within six <br />inches of the ground surface beyond the 50 feet from a vent. <br />