My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-24_PERMIT FILE - C1980007A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2022-06-24_PERMIT FILE - C1980007A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2023 10:27:39 AM
Creation date
6/30/2022 11:40:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
6/24/2022
Doc Name
Fire Break Location and Edwards Mine Fire Emergency Project documents
Section_Exhibit Name
Exhibit 83 Fire Break Location and Edwards Mine Fire Emergency Project documents
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 3 of 14 <br />PROJECT DATES <br /> <br />The project is scheduled for construction between June 13th, 2022 and August 11th, 2022. This includes <br />ten (10) days mobilization time. These dates are tentative and may change. <br /> <br />TIME OF COMPLETION <br /> <br />The time of completion allowed for the project is 60 calendar days after receipt of the Notice to Proceed. <br />This includes ten (10) days mobilization time. <br /> <br />NOTICE OF AWARD AND EXECUTION OF DOCUMENTS <br /> <br />A Notice of Award will be sent to the apparent low bidder within a reasonable time following the bid <br />submission deadline. The Division of Reclamation, Mining and Safety must receive the following by the <br />date specified in the award letter: <br /> <br />(a) Certificates of Insurance showing proof of required coverage and Additional <br />Insured Endorsement; <br />(b) Project Schedule; <br />(c) AML Contractor Ownership and Control Form, if required; <br />(d) Three-Way Agreement for Reclamation Activities, if required by the Special <br />Conditions; <br />(e) Completed W-9 form, if required (for contractors new to the State). <br />(f) Completed EFT Form- required as of 4/15/2018 <br /> <br />Please consult Articles 2-7 of the General Conditions. <br /> <br />If the above documents are not submitted properly by the contract signing date, the Division of <br />Reclamation, Mining and Safety may elect to award the contract to the next lowest bidder. Bidders are <br />advised to keep close contact with DRMS during this period. <br /> <br />THREE-WAY AGREEMENT <br /> <br />A three way "Agreement for Reclamation Activities" is required for this job. Please see Article 4 of the <br />General Conditions for the applicable insurance requirements. <br /> <br />INSURANCE <br /> A. The contractor shall obtain at his own expense, and maintain at all times during the term of this contract, insurance listed below. Proof of insurance must be submitted on certificates showing the following minimum coverage: 1) Worker’s Compensation Insurance as required by state statute, and Employer’s Liability Insurance covering all of contractor’s employees acting within the course and scope of their employment.
The URL can be used to link to this page
Your browser does not support the video tag.