Riprap shall be placed as close as possible to the lines, grades and thickness <br />- shown on the plans and shall be placed in conjunction with construction o1.` <br />• the channel with only sufficient delay in providing the riprap protection as <br />' may be necessary to avoid disturbance of the riprap due to other construe- • <br />lion operations. <br />I~ <br />~ ~ B. Dumped Riprap <br />i Stone for riprap shall be dumped on the prepared slope or area in a manner <br />which will produce a reasonable well-graded mass of stone with the <br />minimum practicable percentage of voids. The entire mass of stone shall be <br />placed so as to be in conformance with the lines, grades and thickness shown <br />on the plans. Riprap shall be placed to its full course thickness at one <br />` operation and in such a manner as to avoid displacing the underlyiry; <br />material. Placing of riprap in layers, or by dumping into chutes, or by <br />~ similar methods likely to cause segregation, wtll not be permitted. <br />The larger stones shall be well distributed and the entire mass of stone shall <br />conform to the gradation specified in Section 2.02B. All material going into <br />riprap protection shall be so placed and distributed that there will be no <br />large accumulations of either the larger or smaller sizes of stone and the <br />surface should be relatively smooth with no large protrusions of rock. <br />l Riprap specified on the Drawings and/or designated by the Engineer may be <br />dumped by a machine and machine spread except adjacent to structures and <br />in locations where machine spreading provides an unsatisfactory surface; in <br />these locations hand laid rock may be required to make a proper transition <br />to existing or satisfactory areas. <br />It is the intent of these Specifications to produce a fairly compact riprap . <br />Gabion baskets or mattresses shall be constructed as nearly as possible to <br />the dimensions shown on the plans. Jn addition to conforming with recom.- <br />mendations of the gabion manufacturer, the following minimum requirer <br />i ments shall be adhered to: <br />1. The section of the stream bed and banks where the units are to be <br />~- placed shall be excavated to the depths required and cleared of large <br />stones. Each row of gabion baskets or mattresses shall be wired <br />together and the walls and ends of the units tied to cuts in the bank. <br />r A plastic filter cloth or filter blanket shall be placed under the <br />bottom gabion prior to placement of the baskets or mattresses. <br />2. Prior to filling the baskets or mattresses with rock, the gebions shall <br />( be stretched by means of tension wires. The tension wires shall t>e <br />L removed after the filling operation is complete. <br />_ protection in which all sizes of material are placed in their proportion>. <br />Hand placing or rearranging of stones by mechanical equipment may be <br />C required to the extent necessary to secure the results specified. <br />C. Wire Enclosed Riprap (Gabions) <br />~ 3. The facing rocks shall be hand placed, leaving a minimum amount of <br />L voids. After The basket has been one-third filled, the sides shall be <br />secured with cross-connecting wires. After the baskets have been • <br />C filled flush with top (do not overfill), the lids shall be wired closed. <br />~ 02540-8 <br />L <br />