Laserfiche WebLink
Exhibit 68 <br /> Major Buildings and Structures Dimensions Summary <br /> Builth /Structure Dimensions Constri4on Materials <br /> Stack Tube 4 12"Thick 106'h x 12'diameter Concrete <br /> Tube 4 Footing 2'd x 3'w(38'circ.) Concrete <br /> Reclaim Tunnel Floor 400'1 x 16'w Concrete <br /> Walls 2@ 400'1 x 12'h Concrete <br /> Roof 400'1 x 16'w Concrete <br /> Footer 400'+400'+16'+16' Concrete <br /> Escapeway Tunnel 1801 x 4'diameter CMP <br /> Conveyors Overhead 225'1 N/A <br /> Underground 555'1 N/A <br /> MCC Building Superstructure 1 @ 1351 x 9'w Steel <br /> (Next to Silos) Floor 1 @ 13.5'1 x 9'w x 8'h Concrete <br /> Footings 1 @ 13.5'1+13.5'+9'+9' Concrete <br /> Dozer Service Superstructure 30'h x 42'6"w x 50'1 Steel <br /> Facility Floor 42'6"w x 50'1(6"deep, reinforced) Concrete <br /> Footings 4@ 7'6"square x 1'6"h (reinforced) Concrete <br /> Piers 4@ 2'w x 3'2"1 x 4'h(reinforced) Concrete <br /> Footings 2@ 18"square x 1'h (reinforced) Concrete <br /> Footings 2@ 6'w x 7'3"1 x 1'6"h(reinforced) Concrete <br /> Piers 2@ 27"x 1'x 4'h(reinforced) Concrete <br /> Pier 1 @ 4'h x 1'w x 2'5"(reinforced) Concrete <br /> Footing 5'x 5'x 1'6"(reinforced) Concrete <br /> Retaining Walls 1'w x 12'h x 72'1(reinforced) Concrete <br /> (partially below grade 1'w x 8'h x 25'1(reinforced) Concrete <br /> on S&W sides and @ <br /> SW corner) <br /> Apron 8'w x 12'4"1(2'deep, reinforced) Concrete <br /> 8'w x 17'8"1(1'deep, reinforced Concrete <br /> Office Propane Tank Pre-fabricated Tank 18'long x 64"diameter Steel <br /> Su ort bases 2@ Tx Tx 1' reinforced Concrete <br /> Includes concrete apron located outside the superstructure. <br /> A large portion of this structure is located more than 4 feet below the ground surface. <br /> Page 5 of 5 6196 MR192;106 MR196;9196 MR249:11118-MR430 <br />