Laserfiche WebLink
SECTION 02102 -CLEARING, GRUBBING AND TOPSOIL STRIPPING • <br />PART1-GENERAL <br />1.01 Description <br />This work shall consist of clearing, grubbing, removing and disposing of all vege- <br />-- tation and debris within the limits of construction, except objects that are desig-• <br />Hated to remain or are to be removed in accordance with other sections of these <br />Specifications. This work shall also include the preservation and protection of all <br />,.. vegetation and objects designated to remain. This work shall also consist of <br />stripping and stockpiling topsoil as specified. <br />'-~ PART 2 -PRODUCTS <br />-- PART 3 -EXECUTION <br />3.01 Preparation <br />~- <br />The Contractor shall locate the limits of construction for each item to be <br />constructed and shall limit his clearing and grubbing activities to this area. <br />~~ 3.02 General • <br />The area within the limits of construction shall be cleared and grubbed of all sur-• <br />face objects, trees, stumps, brush, vines, hedgerows, fences, foundations, masonry. <br />and other obstructions not designated to remain. The Contractor shall not damage <br />trees, shrubs, vegetation, fences, structures or other items outside the construction <br />limits. <br />•- 3.03 Topsoil Handling <br />A. Stripping <br />The area within the limits of construction shall be stripped of topsoil to the <br />depth indicated by the Test Hole Logs but in no case shall this depth be less <br />than twelve (12") inches. Topsoil is to be stripped after all clearing and <br />grubbing operations have been completed. <br />B. Stockpiling <br />The topsoil, after being removed, shall be immediately redistributed to en <br />' area that has been prepared for topsoil or shall be stockpiled in the area <br />designated: "Topso^ Storage Area". StockpIled topsoil shall be placed in the <br />designated area at a slope no steeper than 4 horizontal to 1 vertical and <br />shall be protected from wind and water erosion, unnecessary compaction and <br />contaminants which may lessen the capability of the material to support <br />-- vegetation. If, during the period of construction, the Engineer or ARCO • <br />02102-1 <br />