My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-24_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2022-06-24_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2022 11:37:28 AM
Creation date
6/30/2022 11:29:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/24/2022
Section_Exhibit Name
EXHIBIT 68 Major Building & Structures As-Built Summary
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNT GUNNISON NO. 1 MINE <br />RUNOFF POND NO. 1 <br />(MB~1) <br /> <br />BID SCHEDIILE <br />Description, Approximate Quantity and Unit and Lump Sum <br />Item No. Price in Words and Figures Total Price <br />1. Mobilization of equipment, materials, personnel and mis- <br />cellaneous items to the project site at the lump sum <br />price of Dollars and Cents. <br />2. Clearing and grubbing of vegetation and debris within the <br />limits of construction at the lump sum price of <br />Dollars and Cents. <br />3. Topsoil stripping to the depth indicated by the test holes or $ <br />to 12 inches, whichever is greater, and the stockpiling of <br />topsoil at the lump sum price of Dollars <br />and Cents. <br />- Approximate Quantities: <br />Topsoil: 10,390 cubic yards <br />"_°~• 4. Embankment construction, complete in place, including $ <br />excavation, baekfill and compaction to the lines and grades <br />shown on the drawings and to the requirements of these <br />_ Specifications at a lump sum price of <br />Dollars end Cents. <br />Approximate Quantities: <br />Excavation: 22,900 cubic yards <br />Backfill (Type 1): 32,720 cubic yards <br />Topsoil: 1,076 cubic yards <br />Seeding: 6,453 square yards <br />Toe drain, complete in place, including filter material, Types <br />3 and 4, perforated pipe and non-perforated pipe at the <br />lump sum price of Dollars and <br />Cents. <br />Approximate Quantities: <br />Type 3 Materiel: 1,830 cubic yards <br />Type 4 Material: 120 cubic yards <br />6" ~ Perforated PVC: 895 linear feet <br />6" ~ Non-perforated PVC: 190 linear feet <br />Concrete in Outlet Headwall: .5 cubic yards <br />Reinforcing Steel in Headwall: 45 pounds <br />4' Diameter Manhole: 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.