Laserfiche WebLink
COMPLIdNCE WITH THE SPECIFICATIONS <br />' ~ FOR THE CONST:iUCTION OF THE MOUNT GUNNISON <br />NO. 1 MINE RUNOFF POND NO. 1 (MB~1) DAP/I <br />The Owner through his Engineer shall provide adequate supervision during the <br />period of construction and make the work available for insaection to the Office of the <br />State Engineer. <br />The Owner's Engineer shall notify the State Engineer of the date of completion of <br />the construction and shall certify that the work was in compliance with these Specifi- <br />cations and the Plans. The works shall not be considered complete until the State <br />Engineer and Merrick dt Company have approved the same in writing. <br />The Plans and Specifications will not be materially changed in any particular, <br />without the prior written approval of the State Engineer and Merrick & Company. <br />i , <br />/~' ~~ <br />C <br />authorized Representative <br />ARCO Coal Comoanv <br />Division of Atlantic Richfield Company <br />Date <br />• <br />