Laserfiche WebLink
-4- <br /> 12. Primary future Post-minin land use check one): <br /> Cropland(CR) Pastureland(PL) `� General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary vresent land use(check one): <br /> 0 Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) L..J Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Mining will be done with loaders and other equipment pushing sand and gravel into stockpile,then loaded on trucks and hauled to road repair sites within the county. <br /> 15. On Site Processing: 1-1 Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> There will be no processing of materials,other than some occasional mixing with other road base materials brought from off-site. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> No chemicals will be used. <br /> 16. Descriution of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> Increasing size by 9.31 acres. This will be done by moving north boundary line approximately <br /> 314 ft and north west boundary line approximately 400 ft. <br />