Exhibit E <br /> Harold Eichman Pit M-1905-105 <br /> Reclamation Plan <br /> When construction material has been depleted, all areas will be re-graded to <br /> form a 3:1 slope that blends in with the undisturbed adjacent ground. The <br /> grade will also be sloped on the North and South side of Pond Creek to restore <br /> the streambed. Mining of material in the bed has been executed deeper than <br /> the original streambed outside of the affected area. Subsequent rain events <br /> will cause sediment to be deposited in the streambed of the affected area, <br /> eventually leveling the bed to the same grade as the bed in the unaffected area. <br /> Additional imported topsoil material will likely be required to provide <br /> quantities sufficient to allow for adequate revegetation of the site. <br /> Three to four inches of topsoil will be used to cover the entire reclaimed area <br /> (except for the streambed). <br /> Supplementing the plant growth medium with 10-20 tons per acre of organic <br /> matter (composed manure) will be part of the reclamation process. <br /> As needed, compacted areas will be ripped and disked prior to revegetation. <br /> Measures taken to re-vegetate the site will be in accordance with the seed mix <br /> recommended by the MRCS. <br />