Laserfiche WebLink
June 15,2022 C-1983-059/Terror Creek Loadout LDS <br /> Inspection Topic Summary <br /> NOTE: Y Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection N -Roads <br /> N -Availability of Records N -Reclamation Success <br /> N -Backfill&Grading N -Revegetation <br /> N -Excess Spoil and Dev.Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish&Wildlife N - Support Facilities On-site <br /> N -Hydrologic Balance N - Signs and Markers <br /> R -Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N -Other N - Special Categories Of Mining <br /> N -Processing Waste N -Topsoil <br /> COMMENTS <br /> This was a partial inspection by Leigh Simmons of the Division of Reclamation,Mining and Safety(Division). <br /> The weather was clear,warm and dry. There was no sign of any activity at the site besides some weed spraying, <br /> and no sign of any recent disturbance. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> With PR-I,Oxbow changed the post-mining land use for the site to Industrial/Commercial(see section <br /> 2.05.5 of the PAP).The previous reclamation plan was also retained in the PAP, since this is what the Division <br /> would revert to if the permit were revoked(see section 2.05.4).At the time of the inspection the site had been <br /> graded in accordance with the plan described in 2.05.5 and shown on Map 10. The site had not yet been graveled <br /> or otherwise made ready for RV/boat storage, and the subsoil surface had not be spread with topsoil or seeded.As <br /> a result the disturbed area had become thick with opportunistic annual"weeds".The Pest and Disease Control Plan <br /> describes how noxious weeds are to be controlled at the site(see page 2.05-14R of the PAP). It is important to <br /> monitor the site closely to ensure that weeds are controlled until one or other of the reclamation plans can be <br /> properly enacted. <br /> DOCUMENTS RECEIVED <br /> N/A <br /> OTHER(SPECIFY) <br /> N/A <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 8 <br /> Number of Complete Inspections this Fiscal Year: 4 <br /> Page 2 of 7 <br />