Laserfiche WebLink
1000LORADO <br /> .0 Division of Reclamation, <br /> Mining and Safety <br /> Department of Natural Resources <br /> 21 June 2022 <br /> Ms.Miranda Kawcak <br /> Seneca Property,LLC <br /> 29515 Routt County Road 927 <br /> Oak Creek,CO 80467 <br /> RE: Annual Reclamation Report 2021 (ARR) <br /> Yoast Mine,Permit No. C1994082 <br /> Dear Ms.Kawcak; <br /> Thank you for the timely submission of the Yoast Mine 2021 ARR. The Colorado Division of <br /> Reclamation,Mining and Safety has completed its preliminary review of the above referenced report. <br /> Please see the Division's findings below regarding the report's compliance with the following Rules. <br /> o Rule 2.04.13(1)—The 2021 ARR is dated 1 April 2022 and the Division received an electronic <br /> copy of the report on that date. <br /> a. The name and address of the permittee is on the report form. <br /> b. For the reporting year zero acres of lands were placed in the Acres Disturbed Category <br /> comprising backfill/grading,long term facilities and active mining areas. Active mining <br /> is not occurring at the site,and reclamation activities have been completed as permitted. <br /> c. For the reporting year,zero acres were reported to have been backfilled or graded. <br /> d. For the reporting year,zero acres of affected lands were seeded in the 9 years and less <br /> category for a cumulative total of 88.5 acres. <br /> e. A total of zero acres where phase I bond released in 2021. A total of approximately 200 <br /> acres represents the balance of Phase I reclamation remaining at the site. <br /> f. 2021 phase II bond released acres comprised 193 acres. <br /> g. The operator conducted weed control activities throughout the site as summarized in the <br /> submitted weed spray logs for 2021. <br /> h. The values for active,backfilling and grading and permanent facilities for 2021 reconcile <br /> with acres disturbed. These sums add up. <br /> April 2021 DRMS Adequacy/Discrepancies <br /> DRMS 21 June 2022 <br /> 1. Cumulative totals for Phase I and phase III bond released acres are incorrect on the 2021 ARR <br /> form. It appears you are undercounting reclamation for these phases. Please correct the acreages <br /> and resubmit the corrected ARR form by 15 July 2022. <br /> 4F COlO <br /> Physical: 1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 ��`_ = <br /> Mailing: DRMS Room 215, 1001 E 62nd Ave, Denver, CO 80216 https://drms.colorado.gov <br /> Jared S. Polis, Governor I Dan Gibbs, Executive Director I Virginia Brannon, Director <br /> 'F18764L <br />