My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-21_INSPECTION - M2012032
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2012032
>
2022-06-21_INSPECTION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 8:07:16 AM
Creation date
6/22/2022 7:05:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Inspection
Doc Date
6/21/2022
Doc Name Note
Corrective Action Request for Clarification
Doc Name
Inspection Problem
From
Ouray Silver Mines, Inc
To
DRMS
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ouray Silver Mines, Inc. <br /> 1900 Main St. Unit 1 <br /> PO Box 564 <br /> Ouray,CO 81427 <br /> QL`RAY S,ILtER 114'VE <br /> June 14t'',2022 <br /> Mr. Lucas West �+ <br /> Colorado Division of Reclamation, 14�5 ' <br /> Mining and Safety <br /> Room 215 JUN 21 2022 <br /> 1001 East 62°d Avenue <br /> Denver, CO 80216 MINING&SAFETY-MINERA OF LS <br /> Subject: Inspection Problem Corrective Action <br /> Atlas TSF—As-Built <br /> DRMS Permit No. M-2012-032 <br /> Revenue Mine,Ouray County,Colorado <br /> Dear Mr. West, <br /> Ouray Silver Mines, Inc. (OSMI)has performed a final survey of the Atlas TSF to develop an as-built <br /> drawing and to confirm the location of the TSF in relation to the 2013 wetlands delineation. This <br /> information is being provided per request by the Division of Reclamation Mining and Safety(DRMS) in <br /> its letters dated March 14"and April 1111, 2022 regarding certification of the Atlas Tailings Storage <br /> Facility(TSF). <br /> A final as-built drawing of the Atlas TSF is attached as well as a figure showing the outline of the TSF in <br /> relation to the 2013 wetlands survey and permit boundary. <br /> Per DRMS letter dated April 11,2022,OSMI was to provide an as built drawing by June 1,2022. <br /> However,due to delays in securing an available surveyor and other factors,we were unable to perform <br /> the survey until June 13, 2022. Therefore,we respectively request an extension to the certification date <br /> until July 1,2022.As you are aware,the mill has not been operational since mid-January 2022 and no <br /> new tailings have been placed on the Atlas TSF temporary storage area since January. The mill likely will <br /> not be operational this quarter negating the need for tailings storage at this time. <br /> OSMI appreciates your attention to this matter. If you have any questions,please contact me at(970)325- <br /> 9830. <br /> Sincerely, <br /> Poppy Staub <br /> VP Environment and Government Affairs <br /> Ouray Silver Mine Inc <br /> Phone:(970)325-9830 i Fax:(970)325-9824 <br />
The URL can be used to link to this page
Your browser does not support the video tag.