Laserfiche WebLink
-2- <br /> 10. Primary Mine Entrance Location(report in either Latitude/Longitude OR UTM): <br /> Latitude/Longitude: <br /> Example: (N) 390 44' 12.98" <br /> (W) 104° 59' 3.87" <br /> Latitude(N): deg min sec (2 decimal places) <br /> Longitude(W): deg min sec (2 decimal places) <br /> OR <br /> Example: (N) 39.736910 <br /> (W) -104.98449° <br /> Latitude(N) 39 001549 (5 decimal places) <br /> Longitude(W) -102 35285 (5 decimal places) <br /> OR <br /> Universal Tranverse Mercator(UTM) <br /> Example: 201336.3 E NAD27 Zone 13 <br /> 4398351.2 N <br /> UTM Datum(specify NAD27,NAD83 or WGS 84) Nad 83 Zone 12 <br /> Easting <br /> Northing <br /> 11. Primary Future(Post-mining)Land Use(check only one): <br /> El Cropland(CR) 0 Pastureland(PL) El General Agriculture(GA) <br /> El Rangeland(RL) 0 Forestry(FR) Wildlife Habitat(WL) <br /> El Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> ❑ Developed Water Resources(WR) ❑ Solid Waste Disposal(WD) <br /> 12. Primary Present Land Use(check only one): <br /> ❑ Cropland(CR) ❑ Pastureland(PL) ❑ General Agriculture(GA) <br /> El Rangeland(RL) 0 Forestry(FR) Wildlife Habitat(WL) <br /> 13 Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> El Developed Water Resources(WR) Mining(MN) <br /> 13. Estimated Beginning Date of Contract: August 2022 <br /> 13.1 Estimated completion date of contract: December 2022 <br />