Laserfiche WebLink
All areas disturbed and reclaimed and any other important items regarding reclamation will be <br /> submitted in the required annual reports to the Division. Throughout the process, weed <br /> mitigation will occur through mechanical removal. If there are issues that arise regarding <br /> noxious weed control, A&S Construction will contact the Cheyenne County Noxious Weed <br /> Coordinator for guidance. <br /> 9. Reclamation Bond <br /> The bond for the site will be based upon$2,500 per acre. The site will have 30.0 acres of <br /> disturbance. Since a fraction of an acre is counted a whole acre by the Division, the bond will be <br /> 30.0 acres x $2,500.00 per acre= $75,000.00. <br />