My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-16_REVISION - P2022006
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2022006
>
2022-06-16_REVISION - P2022006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 8:45:43 PM
Creation date
6/21/2022 8:35:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2022006
IBM Index Class Name
Revision
Doc Date
6/16/2022
Doc Name
Adequacy Review Response
From
Climax Molybdenum
To
DRMS
Email Name
SMS
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TYPICAL DRILL PAD SECTION <br /> CONCEPTUAL PLAN <br /> 20' X 12"0 STRAW WATTLE W/STAKES 1 June 2022 <br /> OR PARTIALLY BURIED TIMBER ALONG <br /> ENTIRE LENGTH OF ROAD <br /> \ LP - MEET PROPOSED DITCH <br /> 50'x90' PAD 2'HX5'W SAFETY BERM TYPICAL ROCK CHECK DETAIL <br /> Cut <br /> —2% <br /> 50' \Fill <br /> 16475.95 Cu. Yd. 0.02 Cu. Yd. <br /> ROCK MUST TYPICAL ROAD SECTION THE BOTTOM <br /> AND SIDES <br /> COVER <br /> THE BOTTOM AND SIDES OF THE DITCH <br /> \ 20' <br /> 24"MIN. <br /> GNE K CROSS SECTION <br /> \ 12' 2'HX5'W SAFETY BERM pM <br /> O <br /> 20' X 12"0 STRAW <br /> \ WATTLE W/STAKES OR 2H:1V SLOPES <br /> 5% PARTIALLY BURIED L=THE DISTANCE SUCH THAT POINTS A <br /> �— TIMBER ALONG ENTIRE AND B ARE OF EQUAL ELEVATION <br /> 2"_4" <br /> LENGTH OF ROAD N L B ROCK <br /> 1'D DITCH W/STRAW <br /> WATTLES EVERY 50' <br /> (SEE DETAIL BELOW) <br /> 1 �\ CHECK DAM <br /> TYPICAL DITCH SECTION \ �n;\ SPACING <br /> PUZZLER MINE ROAD <br /> II I ii I I I�I i =1 I I�WH ROPO <br /> I <br /> I I= I I I I I I II II I \ \ <br /> — =III=III= <br /> 5' X 6"0 STRAW WATTLE W/ 24" STAKES EVERY 50' <br /> DWG.# REFERENCE DRAWINGS DESCRIPTION OF REVISION DATE BY APPR DEPARTMENT APPROVALS ENGR: JLF 1/13122 HENDERSON OPERATIONS MINE SITE SURFACE <br /> CONCEPTUAL PLAN APPROVED 5/5/22 JS JLF DRAWN BY: JS 1/13/22 <br /> CHECKED BY: BDR 5/5122 PUZZLER MINE <br /> APPROVED BY: JLF 5/5/22 ®Climax Molybdenum PROPOSED DRILL ROAD <br /> APPROVED BY: A Freeport-McMoRan Company DETAILS <br /> EMPIRE/PARSHALL,COLORADO <br /> 4 SCALE: NOT TO SCALE SAFETY APP BY: 303-569-3221 2-2-9020 SHT 2 OF 2 1 REV. o <br />
The URL can be used to link to this page
Your browser does not support the video tag.