My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-15_PERMIT FILE - M2022029
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022029
>
2022-06-15_PERMIT FILE - M2022029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2022 8:30:23 PM
Creation date
6/16/2022 7:53:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022029
IBM Index Class Name
Permit File
Doc Date
6/15/2022
Doc Name Note
check was not endorced to the Division
Doc Name
Application
From
Randall K. Kokkinen
To
DRMS
Email Name
ERR
JDM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•U.S.Bureau of Land Management or the U.S.Forest Service if the proposed operation will occur on federal lands; <br /> •U. S.Army Corps of Engineers regarding a dredge and fill(404)permit;and <br /> • The County Planning Department for the county or counties in which your proposed operation is located. Section 34-32-109(6), <br /> C.R.S. requires a mining operator to be responsible for assuring that the mining operation and the post-mining land use comply <br /> with local land use regulations and any master plan for extraction adopted pursuant to Section 34-1-304,C.R.S. <br /> PERMIT APPROVAL: <br /> An applicant will not be issued a reclamation permit until notified by the Office that this application and the required performance and <br /> financial warranties have been approved. Alternatively, an automatic approval will occur where the Office fails to notify the <br /> applicant/operator that the application has been denied. This decision must be made thirty (30) calendar days from the date the <br /> application was submitted.However,the performance and financial warranties must be submitted and approved by the Office before the <br /> permit will be issued even if you receive an automatic approval. NO MINING OPERATIONS SHALL BEGIN UNTIL A PERMIT IS <br /> ISSUED(Rule 4.1(2)). <br /> NOTICE REQUIREMENTS: <br /> Within ten (10) days after filing, mail or personally serve a copy of the notice described in Rule 1.6.2(1)(c)to all owners of record of <br /> surface rights to the affected land and all owners of record of lands that are within 200 feet of the boundary of the affected land (Rule <br /> 1.6.2(l)(d)(i) and(ii). In addition, you must publish once in a newspaper of general circulation,in the locality of the proposed mining <br /> operation, the notice described in Rule 1.6.2(1)(c). A copy of a form which includes all required information for the notice has been <br /> attached for your use. You will need to provide the Office proof of notice prior to the decision date. Proof of notice may be by <br /> submitting return receipts of a certified mailing or by proof of personal service(Rules 1.4.1(4), 1.4.2(4)(c)and 1.6.2(l)(d)). <br /> NOTE TO COMMENTORS/OBJECTORS: <br /> It is likely there will be additions, changes, and deletions to this document prior to final decision by the Office.Therefore,if you have <br /> any comments or concerns you must contact the applicant or the Office prior to the decision date so that you will know what changes <br /> may have been made to the application document. <br /> The Office is not allowed to consider comments,unless they are written,and received prior to the end of the public comment period. <br /> You should contact the applicant for the final date of the public comment period. <br /> If you have questions about the Mined Land Reclamation Board and Office review and decision or appeals process,you may contact <br /> the Office at(303)866-3567. <br /> COMPLETION OF MINING: <br /> Upon completion of any phase of reclamation,you should consult Rule 3.1 for reclamation standards and 4.16 for details on how to <br /> request a reclamation responsibility release from the Board. <br /> A17COLORADO <br /> Uivislon of Reclamation. <br /> ttirtiny and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> LIMITED IMPACT OPERATION(110(1)) <br /> RECLAMATION PERMIT <br /> APPLICATION FORM <br /> CHECK ONE:New Application X <br /> Permit#M--(provide for conversions and amendments of existing permits) <br /> The application for a Limited Impact I I0(1)Mining Operation Reclamation Permit contains three major parts:(1)the application form; <br /> (2) Exhibits A-J, any required sections of Exhibit S and Geotechnical Stability Exhibit,as required by the Office,and outlined in Rules <br /> 6.1, 6.2, 6.3, and 6.5; and(3) the application fee. When you submit your application, be sure to include one(1)signed and notarized <br /> original and one (1) copy of the application form,two(2)copies of Exhibits A-J,and 6.5(Geotechnical Stability Exhibit),as required, <br /> and a check for the application fee described under(4) below. Exhibits should not be bound or in a 3-ring binder; maps should be <br /> folded to 8 1/2"X I I"or 8 1/2"X 14"size.To expedite processing,please provide the information in the format and order described in <br />
The URL can be used to link to this page
Your browser does not support the video tag.