My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-15_PERMIT FILE - M2022029
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022029
>
2022-06-15_PERMIT FILE - M2022029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2022 8:30:23 PM
Creation date
6/16/2022 7:53:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022029
IBM Index Class Name
Permit File
Doc Date
6/15/2022
Doc Name Note
check was not endorced to the Division
Doc Name
Application
From
Randall K. Kokkinen
To
DRMS
Email Name
ERR
JDM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l__j au-yearlong or L_AI seasonauy, expiam: _Area is only accessinie iviay inrougn <br /> October <br /> 4) How many aces of the mine site will be disturbed at any given time: 0.01 acres <br /> 5) Depth of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches 6-8 inches <br /> 8-10 inches 10-12 inches <br /> X_Other: ,0-4 inches Most areas contain no topsoil. <br /> N/A, explain: <br /> 6)Will you need to move any overburden (check one): (X)Yes or()No <br /> a. If yes, approximately how thick is the overburden? 4 -5 feet <br /> 7) How will the mine be accessed: (X) existing roads `) new roads will be created <br /> Please describe the existing roads: <br /> _FS 201 runs within 500 feet of the location.A closed off 2 track will be used from <br /> there. <br /> a. If there will be new roads or road improvements,please describe the new roads and road <br /> improvements: <br /> N/A <br /> 8)Will water be needed during the mining operation (check one): (-)Yes or( X)No a. If yes, please <br /> describe the source of the water and how much water will be used during the operation: <br /> 9)Will any water diversions or impoundments be constructed (check one): (_)Yes or(X)No a. If <br /> yes, please describe the water diversions or impoundments: <br /> 10)Will any chemicals be used during the mining process (check one): `)Yes or(X)No a. If yes, <br /> please describe the chemical types and quantities to be utilized,chemical storage and spill <br /> containment and emergency response plans for on-site spills. Plant operation details should <br /> include tank capacities and operating solution volumes: <br /> 11)Will the deposit/ore be processed on-site(check one): (_)Yes or( X)No a. <br /> If yes, please describe how the deposit/ore will be processed on site: <br /> Everything will be taken home to <br /> process. <br /> 12)Will explosives be used at any point in your mining operation (check one): `)Yes or( X_)No <br /> 13) Please identify the primary and secondary commodities to be mined: <br />
The URL can be used to link to this page
Your browser does not support the video tag.