Laserfiche WebLink
Page 6 <br /> Mr. Peter Hays <br /> February 1s', 2022 <br /> 25. Please provide a copy of the generic structure agreement sent by the Applicant to the structure <br /> owners within 200 feet of the proposed affected area boundary for Division review. 6.5 <br /> Geotechnical Stability Exhibit See attached. <br /> 26. Please provide the XSTABL model data files in electronic format to allow the Division to verify <br /> the stability analysis using Clover Technology's Galena slope stability software. Included in the <br /> supporting documents zip folder emailed with this letter. <br /> 27. Please provide a map indicating the location of the three (3) typical cross-sections used by the <br /> Applicant in the stability analysis. 28. Please update the Exhibit C-Mining Plan Maps to indicate <br /> the required offsets from the gas lines and the slurry wall from the stability analysis results. I have <br /> included an Exhibit C-7 which includes the three typical cross-sections and the offsets from <br /> the slurry walls and gas lines. <br /> Please feel free to contact me with any questions or concerns at Kyle(cDcivilresources.com or my cell <br /> number 408-930-2544. <br /> Regards, <br /> CIVIL RESOURCES, LLC <br /> Kyle Regan <br /> Project Geologist <br /> PUnited Water&San-1411Section 201DRMSICorrespondencelDRMSIAdequacylAdequacy Response_06022022 doc <br />