Laserfiche WebLink
approached the vicinity of the site and represent a growing need for both construction <br /> materials and water storage facilities. <br /> (c) A description of how the Reclamation Plan will be implemented to meet each <br /> applicable requirement of Section 3.1. <br /> The Operator will carry reclamation to completion with reasonable diligence. Each phase <br /> of reclamation will be generally completed within one to two years from completion of <br /> mining, but not more than five years from the date the Operator informs the Board or Office <br /> that final reclamation has commenced. <br /> Section 3.1.5 Reclamation Measures Material Handling: <br /> Grading will be performed to help control erosion and siltation of the affected lands through <br /> phased mining, implementing good operation techniques to handle material as little as <br /> possible, and vegetation of stockpiles remaining in place for more than 180 days with the <br /> Weld County Sandy Site seed mix: <br /> Weld County-Sandy Site Mix <br /> Bluestem (Champ, Chet) 1.00 Ibs pis/acre <br /> Sand Lovegrass (Bend, Native, Ne27) 2.50 Ibs pis/acre <br /> Indian Ricegrass (Nezpar, Rimrock) 3.00 Ibs pls/acre <br /> Prairie Sandreed (Goshen) 0.75 Ibs pis/acre <br /> Green Needlegrass (Lodorm) 1.50 Ibs pis/acre <br /> Little bluestem (Blaze, Cimarron, Camper) 0.75 lbs pis/acre <br /> Yellow Indiangrass (Cheyenne, Holt, Scout) 0.50 Ibs pis/acre <br /> Switchgrass (Blackwell, Nebraska 28) 1.50 Ibs pis/acre <br /> Sand Dropseed 0.50 Ibs pis/acre <br /> Total: 12.00 pounds pis/acre <br /> Although the use of erosion protection devices is not anticipated, if deemed necessary by <br /> the operator at the time of excavation, silt fence, haybale dams or other erosion control <br /> devices will be installed. Backfilling and grading will be completed as soon as feasible <br /> after the mining process is complete for each phase. <br /> Maximum slopes and slope combinations will be compatible with the configuration of <br /> surrounding conditions and selected land use. Mining will occur at a slope that is stable. <br /> Reclaimed slopes in the water storage reservoir will not be steeper than a 3:1 ratio and will <br /> be reclaimed at a 4:1 ratio for the slurry wall lined cells mined at 1.5:1 ratio. The upland <br /> area will be reclaimed to grades consistent with pre-mining drainage patterns. <br /> The operator will backfill using fill material generated on-site, or imported inert fill <br /> generated outside the permit area. If any inert off-site material is used as backfll, a <br /> notarized letter will be submitted to the Division as required by Section 3.1.5(9) of the <br /> MLRB Construction Material Rules and Regulations. <br /> Section 20-Gravel Mine—MLRB 112 Permit Application <br /> Exhibit E-2 <br />