Laserfiche WebLink
Timetable for Mining and Reclamation <br /> M14VMG AND RECU M01010t <br /> YEAR MINING PHASE RECLAMATION PHASE <br /> 1 CELL 1 <br /> CELL 2(PHASE 1) <br /> CELL 8(P4ASE A21 OR ' <br /> 2 CELL 3(PH-1) <br /> 3 CELL 3(PH-2) CELL 3(PH-11 <br /> 4 CELL 3(PH-3) CELL 3(PH-2) <br /> 5 CELL 4(PW1) 'CUL 3(PH-3) <br /> 6 CELL 4(PH-2) CELL 4(PH-1) <br /> 7 to 8 CELL 4(PH-3) CELL 4MW2) <br /> CELL 2(PH-2) <br /> 9 CELL 5N(PH-1) CELL 4(PH4) <br /> 10 CELL 5N(PH-2) CELL 5N(PH-1) <br /> 11 CELL SN(PH-3) CELL SN(PH-2) <br /> 12 CELL 5S(PH-1) CELL 5N(PH-3) <br /> 13 CELL 55(PH-2) CELL 5S(Pf4-1) <br /> 14 CELL 5S(PH-3) CELL 5S(PH-2) <br /> 15-16 CELL SS(PH-4) CELL S5(PH-3) <br /> CELL 2(PH 3) <br /> 17 CELL 6(PH-1) CELL SS(PH-4) <br /> 18 CELL 6(PH-2) CELL 6(PH-1) <br /> 19 CELL 6(PH-3) CELL 6(PH-2) <br /> 20 CELL 6(PH-4) CELL 6(PH-3) <br /> 21 CELL 7(PH-1) CELL 6(PH-4) <br /> 22 CELL 7(PH-2) CELL 7(PH-1) <br /> 23 CELL 8(PH-I)CS ONLY+ CELL 7(PH-2) <br /> 24 CELL 8(PH-2)CS ONLY+ Cell 8(PH-1) <br /> 25 Cell 8(PH-2) <br /> (t) Use Mining Plan Map in conjunction with narrative to present: <br /> (i.) Nature, depth and thickness of the deposit and thickness and type of overburden to be <br /> removed <br /> Overburden consists mainly of silty fine grain sand transitioning to sandy silt. Overburden <br /> thickness varied across the site from non-existent in the southwest comer to 15 feet thick <br /> in the southeast. <br /> Section 20-Gravel Mine-MLRB 112 Permit Amendment <br /> Exhibit D-5 <br />