Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#03P Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Packrat Re-establish 3H: 1V Slopes <br /> Site: Whirlwind Mine Permit Action: CS-1 Permit/Job#: M2007044 <br /> PROJECT IDENTIFICATION <br /> Task#: 03P State: Colorado Abbreviation: None <br /> Date: 6/3/2022 County: Mesa Filename: M044-03P <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $97.46 NA <br /> Operating Cost/flour: $97.63 100 <br /> Ripper own.Cost/flour: $15.19 NA <br /> Ripper op.Cost/Hour: $2.49 1 25 <br /> Operator Cost/Hour: $40.04 NA <br /> Total unit Cost/Hour: $252.80 <br /> Total Fleet Cost/Hour: $252.80 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 3,200 <br /> Swell factor: 1.335 <br /> Loose volume: 4,272 LCY <br /> Source of estimated volume: Reclamation Plan <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 100 feet <br /> Unadjusted hourly production: 852.6 LCY/hr <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push gradient: 15 % <br /> Average site altitude: 6,800 feet <br /> Material weight: 2,550 lbs/LCY <br /> Weight description: Sandstone <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br />