My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-08_REVISION - M2007044
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007044
>
2022-06-08_REVISION - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2022 1:28:46 PM
Creation date
6/8/2022 10:08:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Revision
Doc Date
6/8/2022
Doc Name Note
Approval
Doc Name
Change of Status Approval
From
DRMS
To
Scott Bakken - Energy Fuels Resources (USA) Inc.
Type & Sequence
CS1
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: CS-1 update <br /> Site: Whirlwind Mine Permit Action: CS-1 Permit/Job#: M2007044 <br /> PROJECT IDENTIFICATION <br /> Task#: ACY State: Colorado Abbreviation: None <br /> Date: 6/3/2022 County: Mesa Filename: M044-ACY <br /> User: ACY <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> BH1 Whirlwind decline bulkhead construction NA 1 80.00 $111,450 <br /> O11) Removal of structures from Packrat Portal DEMOLISH 1 24.00 $6,901 <br /> 02P Packrat-Seal Portal MINESEAL 1 16.00 $2,724 <br /> 03P Packrat Re-establish 3H: 1V Slopes DOZER 1 18.61 $4,705 <br /> 04P Packrat Pock 0.99 ac of slopes EXCAVATE 1 33.84 $4,819 <br /> 05P Packrat Spread available topsoil over pocking EXCAVATE 1 4.02 $574 <br /> 06P Packrat Cut/fil establish water bars on access rd DOZER 1 7.00 $1,769 <br /> 07P Packrat Reveg 0.99 ac @ portal and 0.95 ac of access rd REVEGE 1 24.00 $13,696 <br /> 08P Packrat Place obstruction boulders in place LOADER 1 3.01 $315 <br /> O1 W Whirlwind Demo of Structures at portal DEMOLISH 1 40.00 $21,520 <br /> 02W Whirlwind Replace I IK cu/yrds of ore in portal LOADER 1 67.54 $7,048 <br /> 03W Whirlwind Remove 18"of sub surface at ore pad LOADER 1 7.98 $833 <br /> 04W Whirlwind Backfill portal MINESEAL 1 16.00 $2,724 <br /> 05W Whirlwind Establish 3H: 1V Slopes on waste piles DOZER 1 23.27 $5,882 <br /> 06W Whirlwind Rip 7.41 ac of compacted areas RIPPER 1 12.69 $3,303 <br /> 07W Whirlwind Spread topsoil over 8.07 ac DOZER 1 27.13 $6,378 <br /> 08W Whirlwind Reveg 8.07 ac REVEGE 1 40.00 $15,241 <br /> 09W Whirlwind Backfill Sediment Pond DOZER 1 15.89 $4,016 <br /> 1 WP Seal 2 air shafts MINESEAL 1 32.00 $33,340 <br /> 2WP Seal 2 power drops BOREHOLE 1 8.00 $172 <br /> 3WP Remove power drop lines DEMOLISH 1 8.00 $461 <br /> 4WP Rip vent and power drop areas prior to topsoil RIPPER 1 2.22 $579 <br /> 5WP Push topsoil over vent and power pads DOZER 1 2.56 $601 <br /> 6WP Reveg 1.1 ac of vent and power pads REVEGE 1 16.00 $7,955 <br /> MB 1 Initial Mobilization MOBILIZE 1 8.00 $8,695 <br /> M132 I Initial Mobilization MOBILIZE 1 8.00 $3,662 <br /> SUBTOTALS: 545.76 $269,363 <br />
The URL can be used to link to this page
Your browser does not support the video tag.