My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-08_REVISION - M2007044
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007044
>
2022-06-08_REVISION - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2022 1:28:46 PM
Creation date
6/8/2022 10:08:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Revision
Doc Date
6/8/2022
Doc Name Note
Approval
Doc Name
Change of Status Approval
From
DRMS
To
Scott Bakken - Energy Fuels Resources (USA) Inc.
Type & Sequence
CS1
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Initial Mobilization <br /> Site: Whirlwind Mine Permit Action: CS-1 Permit/Job#: M2007044 <br /> PROJECT IDENTIFICATION <br /> Task#: MB 1 State: Colorado Abbreviation: None <br /> Date: 6/6/2022 County: Mesa Filename: M044-MB 1 <br /> User: ACY <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $21.28 $37.94 $47.67 <br /> Operating Cost/Hour: $26.55 $50.48 $56.21 <br /> Operator Cost/Hour: $20.54 $20.54 $20.54 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $68.37 $132.49 $147.95 <br /> NON ROADABLE EQUIPMENT, <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> Cat D8T-8SU 53.08 $112.65 $147.95 1 $260.60 $147.95 $250.00 <br /> Cat 319D L 8'-10" 21.50 $52.19 $68.37 1 $120.56 $68.37 $250.00 <br /> Stick <br /> CAT 938H 16.34 $35.16 $68.37 1 $103.53 $68.37 $250.00 <br /> Drill/Broadcast 25.00 $7.98 $68.37 1 $76.35 $68.37 $250.00 <br /> Seeder with <br /> Tractor <br /> Power Mulcher 6.00 $14.98 $68.37 1 $83.35 $68.37 $250.00 <br /> (Bowie LD-90 <br /> CAT 246C 3.58 $21.64 $68.37 1 $90.01 $68.37 $250.00 <br /> Subtotals: I $734.40-T $489.80 1 $1,500.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet CosVhr/fleet <br /> Flatbed Truck,4x2,30K GVW $58.13 1 $58.13 $58.13 <br /> Light Duty Pickup,4x4,3/4 T. $41.16 1 $41.16 $41.16 <br /> Water Tanker,3,500 Gal. $85.26 1 $85.26 $85.26 <br /> Subtotals: $184.55 $184.55 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.