Laserfiche WebLink
BULLDOZER RIPPING WORK <br /> Task description: Whirlwind Rip 7.41 ac of compacted areas <br /> Site: Whirlwind Mine Permit Action: CS-1 Permit/Job#: M2007044 <br /> PROJECT IDENTIFICATION <br /> Task#: 06W State: Colorado Abbreviation: None <br /> Date: 6/6/2022 County: Mesa Filename: M044-06W <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU Horsepower: 310 <br /> Ripper Attachment: 3-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $97.46 NA <br /> Operating Cost/Hour: $97.63 100 <br /> Ripper Ownership Cost/Hour: $15.19 NA <br /> Ripper Operating Cost/Hour: $9.94 100 <br /> Operator Cost/Hour: $40.04 NA <br /> Total Unit Cost/Hour: $260.26 <br /> Total Fleet Cost/Hour: $260.26 <br /> MATERIAL QUANTITIES Selected estimating method: Area <br /> Alternate Methods: <br /> Seismic: NA Bank Volume: NA BCY NA <br /> Area: 7.41 acres Rip Depth(ft): 2.50 Volume: 29,887 BCY or CCY <br /> Source of estimated quantity: Reclamation Plan <br /> HOURLY PRODUCTION <br /> Seismic: <br /> Seismic Velocity: NA feet/second <br /> Area: <br /> Average Ripping Depth: 1.00 feet/pass <br /> Average Ripping Width: 7.08 feet/pass <br /> Average Ripping Length: 100.00 feet/pass <br /> Average Dozer Speed: 88.00 feet/minute <br /> Average Maneuver Time: 0.25 minutes/pass <br /> Production per unit area: 0.703 acres/hour <br /> Job Condition Correction Factors <br /> Unadjusted Hourly Unit Production: 0.703 Acres/hr <br /> Site Altitude: 6,800 feet <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Adjusted Hourly Unit Production: 0.58 Acres/hr <br /> Adjusted Hourly Fleet Production: 0.58 Acres/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Grader(s) Total job time: 12.69 Hours <br /> Unit cost: $445.769 Per acre Total job cost: $3,303 <br /> CIRCES Cost Estimating Software <br />