My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-08_REVISION - M2007044
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007044
>
2022-06-08_REVISION - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2022 1:28:46 PM
Creation date
6/8/2022 10:08:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Revision
Doc Date
6/8/2022
Doc Name Note
Approval
Doc Name
Change of Status Approval
From
DRMS
To
Scott Bakken - Energy Fuels Resources (USA) Inc.
Type & Sequence
CS1
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loader Worksheet Cont'd Task#02W Page 2 of 2 <br /> Total Travel Time: 0.5214 minutes <br /> Total Cycle Time: 0.9839 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 3.90 LCY(heaped) <br /> Bucket Fill Factor: 0.825 Blasted rock-avg.blasted (75-90%)0.825 <br /> Adjusted Capacity: 3.22 LCY <br /> Job Condition Correction Factors <br /> Site Altitude: 6800 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Unadjusted Hourly Unit Production: 196.21 LCY/Hour <br /> Adjusted Hourly Unit Production: 162.85 LCY/Hour <br /> Adjusted Hourly Fleet Production: 162.85 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Loader(s) Total job time: 67.55 Hours <br /> Unit cost: $0.641 /LCY Total job cost: $7,048 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.