Laserfiche WebLink
Loader Worksheet Cont'd Task#08P Page 2 of 2 <br /> Total Travel Time: 0.7424 minutes <br /> Total Cycle Time: 1.2649 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 3.90 LCY(heaped) <br /> Bucket Fill Factor: 0.900 Other-soil,boulders,roots(80-100%)0.900 <br /> Adjusted Capacity: 3.51 LCY <br /> Job Condition Correction Factors <br /> Site Altitude: 6800 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Unadjusted Hourly Unit Production: 166.49 LCY/Hour <br /> Adjusted Hourly Unit Production: 138.19 LCY/Hour <br /> Adjusted Hourly Fleet Production: 138.19 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Loader(s) Total job time: 3.02 Hours <br /> Unit cost: $0.755 /LCY Total job cost: $315 <br /> CIRCES Cost Estimating Software <br />