Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Remaining Reclamation Liability <br /> North River Gravel Pit Permit Action: <br /> Site: Extension SR2 Permit/Job#: M1999007 <br /> PROJECT IDENTIFICATION <br /> Task#: ACY State: Colorado Abbreviation: None <br /> Date: 6/3/2022 County: Rio Blanco Filename: M007-ACY <br /> User: ACY <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> Ola Reseeding failure areas REVEGE 1 8.00 $5,899 <br /> 02a Failure seeding Mobilization MOBILIZE 1 9.20 $2,809 <br /> SUBTOTALS: 17.2 $8,708 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $176 <br /> Performance bond: 1.05 Total= $91 <br /> Job superintendent: 8.60 Total= $619 <br /> Profit: 10.00 Total= $871 <br /> TOTAL O&P= $1,758 <br /> CONTRACT AMOUNT(direct+O&P)= $10,466 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 0.00 Total= $0 <br /> Reclamation management and/or administration: 5.00 $523 <br /> CONTINGENCY: 3.00 Total= $261 <br /> TOTAL INDIRECT COST= $3,042 <br /> TOTAL BOND AMOUNT(direct+indirect)= $11,750 <br />