My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-01_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2022-06-01_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2022 4:44:41 PM
Creation date
6/1/2022 12:41:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
6/1/2022
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
GCC Energy, LLC
Type & Sequence
RN8
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Reclamation Cost Estimate, as required by Rule 3.022(4) was reviewed and updated during <br /> review of Permit Renewal 8. The Division has updated the reclamation cost estimate with <br /> current costs, and has incorporated reclamation task that have been approved via revisions to the <br /> permit since the last reclamation cost estimate. The updated reclamation cost estimate for Permit <br /> Renewal No. 8 is included with this adequacy letter. <br /> GCC Energy has not applied for any bond releases at the King I and II Mine. As such, <br /> reclamation activities that have been conducted, but not requested for bond release must remain <br /> in the estimate. Some tasks from the RN7 estimate have been renumbered, replaced or <br /> eliminated. Tasks that are eliminated have been made obsolete by subsequent approved <br /> permitting actions. A list of renumbered, added, or eliminated tasks is included with this letter; <br /> Task 003 has been eliminated with the approval of TR27 RDA <br /> Task 004: has been eliminated with the approval of TR27 RDA <br /> Task 005: has been eliminated with the approval of TR27 RDA <br /> Task 006: has been eliminated with the approval of TR27 RDA task <br /> Task 008-This is completed, TR27 RDA reconfiguration has made this task obsolete. <br /> This task has been eliminated. <br /> Task 11: was replaced by TR27 configuration. This task has been eliminated. <br /> Added task 12A to RN8 estimate. This was task 004 in TR27 <br /> Task 13: Used TR27 task 4 volumes and distance. <br /> Task 14: Use area from TR27 task 005, Waste bank expansion <br /> Task 015 (truckl): Volumes from TR27 task 001,replaces RN7 Task 15 <br /> Task 016: Take volumes from TR27 task 003 replace RN7 Task 16 <br /> Task 301: This appears to be included in Task 306, eliminate Task 301 <br /> Task 506: Demo air jig and conveyors, approved in MR47 added to RN-RCE <br /> Task 507: Demolish fan housing-approved in MR46. Added into RN-RCE <br /> Task 508: Borehole, Seal GCC-19-6; MR49 <br /> Task 509: Excavate,MR50, backfill trench <br /> Task 510: Broadcast PJ seed mix on MR50 disturbance <br /> Task 511: Portal III seal (TR29) <br /> Task 512: TR29 grade access road <br /> Task 513: TR29 rip KIII access road <br /> Task 514: TR29 —T40 replace topsoil at KIII portal & access road <br /> Please review the RN8 Reclamation Cost Estimate and provide the Division any comments or <br /> questions when GCC Energy provides responses to the adequacy concerns. <br /> Sincerely, <br />
The URL can be used to link to this page
Your browser does not support the video tag.