My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-01_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2022-06-01_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2022 4:44:41 PM
Creation date
6/1/2022 12:41:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
6/1/2022
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
GCC Energy, LLC
Type & Sequence
RN8
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task#TTT Page 14 of 141 <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.200 (CAT HB) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.600 (FND-SF) <br /> Push gradient: 1.225 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.793 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.4354 <br /> Adjusted unit 371.22 LCY/hr <br /> production: <br /> Adjusted fleet 371.22 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.678/LCY <br /> Total job time: 5.76 Hours <br /> Total job cost: $1,450 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.