My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-27_PERMIT FILE - M2022025 (16)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022025
>
2022-05-27_PERMIT FILE - M2022025 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 7:18:30 AM
Creation date
5/31/2022 12:13:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022025
IBM Index Class Name
Permit File
Doc Date
5/27/2022
Doc Name Note
Exhibit E Reclamation Plan
Doc Name
Application
From
BDF, LLC
To
DRMS
Email Name
DMC
AWA
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E RECLAMATION PLAN <br /> 1 . General Reclamation Plan <br /> The total disturbed area to be reclaimed under this permit is 68.5 acres. Reclamation plans can <br /> be viewed on Map F-1. The post-mining land use will be irrigated pasture on the flats and <br /> rangeland on the slopes. All slopes will be reclaimed to 3H:1V. As described in the mining plan, <br /> reclamation will occur concurrently with mining. Three areas will be in operation at any time: the <br /> active mining area, and the mining area being reclaimed, and the facility area. <br /> Topsoil and overburden from the current mining area will be used to reclaim mined out areas. <br /> Topsoil will be replaced on all graded areas in a single 12 inch lift.. By doing this, the distance <br /> that the topsoil and overburden will have to be transported as well as the amount of material <br /> which will have to be rehandled will be minimized. Additionally, the acreage which is <br /> unreclaimed will be minimized, which will make the worst-case reclamation smaller and thus, <br /> the bond will be smaller. <br /> All reclamation slopes will be 3H:1 V or shallower. No more than 500' of highwall will remain <br /> unbackfilled at any time. <br /> An internal road will be left in place for the property owner to access and use the site following <br /> mining. The currently existing access to the property will be left in place for the landowners use <br /> as well. <br /> 2. Reclamation Timetable <br /> The time to complete reclamation is shown below—Table E-2. Exhibit L: Reclamation Costs <br /> describes the worst-case bond scenario. <br /> Table E-2 Reclamation Timetable <br /> Task Description Reclamation Time <br /> 1 lei r E�Ai"ea 1, 6 "Years <br /> 2 Mine Area 2,reclaim Area 1 6 Years <br /> 31 Mine Area 3,reclaim Ar6a 2 7 Years <br /> 4 Mine Area 4,reclaim Area 3 6 Years <br /> Mine Area 5,-reclaimAm 4 - 5 Years <br /> 6 1 Mine Area 6,reclaim Area 5 7 Years <br /> Base Products Gravel Pit 2 <br /> April 2022 E-1 Lewicki& Associates <br />