Laserfiche WebLink
M-1979-089 <br /> May 26, 2022 <br /> Page 2 <br /> 04a Pump Dewater Pond 4- 15.8 ac approx. dewatered 8 ft. (126.4 ac.ft) <br /> Pump into Pond 3, 100 ft away,use 3 pumps <br /> Recharge from bottom (174,420 sq.ft.) Med porosity <br /> 04b Dozer Grade approx. 3,830 LF of 2:1 slopes to 3H:1V at 24'H <br /> cut/fill slopes = 39,900 BCY <br /> 04c Loader Transport topsoil for Pond 4 veg buffer <br /> 7 ac @ 6"deep is 5,620 CCY of topsoil <br /> 04d Dozer Grade half of transported topsoil around Pond 4= 3,141 LCY <br /> 04e Reveg Reveg topsoiled areas around pond 4 = 7 ac <br /> Riparian mix <br /> )5a Ripper Decompact stockpile areas 25 acres <br /> )5b Loader Transport topsoil to stockpile areas <br /> 25 ac @ 6"deep is 20,170 CCY <br /> 05c Dozer Grade half of transported topsoil around stockpile area= 12,254 LCY <br /> 05d Reveg Reveg stockpile area 25 ac with dryland mix <br /> 06a Reveg Plant container stock of Cottonwoods <br /> 30 from TR-7 @ 30 min each <br /> 07b Misc.Truck Water trees weekly, 2 hr per week for 1 yr per AM-3 Adequacy <br /> response <br /> 10a Mob Initial Mobilization <br /> 10b Mob Secondary Mobilization <br /> Indirect Add contingency and Job superintendent costs <br /> Total indirect cost is approx. 30% of direct cost <br /> Please feel free to contact me with any further questions. Amy Yeldell at the Division of <br /> Reclamation, Mining and Safety, Rm 215, 1001 E 62nd Ave, Denver CO 80216. Direct <br /> contact can be made by phone at 303-866-3567 Ext 8183 or via email at amy.yeldell@ <br /> state.co.us <br /> Page 2 of 3 <br />