My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-26_REVISION - M1979089
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979089
>
2022-05-26_REVISION - M1979089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2022 10:46:46 AM
Creation date
5/26/2022 10:29:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979089
IBM Index Class Name
Revision
Doc Date
5/26/2022
Doc Name
Adequacy Review Response #2
From
DRMS
To
Jim Doody - Grand Junction Pipe & Supply CO
Type & Sequence
TR8
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mobilization Worksheet Cont'd Task# IOB Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: GRAND JUNCTION <br /> Total one-way travel distance: 5.00 miles <br /> Average Travel Speed: 40.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $1,393.51 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $44.92 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.13 0.13 <br /> Return Time(Hours): 0.13 0.13 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 1.25 0.25 <br /> JOB TIME AND COST <br /> Total job time: 2.50 Hours <br /> Total job cost: $1,438 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.