My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-26_REVISION - M1979089
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979089
>
2022-05-26_REVISION - M1979089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2022 10:46:46 AM
Creation date
5/26/2022 10:29:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979089
IBM Index Class Name
Revision
Doc Date
5/26/2022
Doc Name
Adequacy Review Response #2
From
DRMS
To
Jim Doody - Grand Junction Pipe & Supply CO
Type & Sequence
TR8
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Initial Mobilization <br /> Site: 23 Road Pit Permit Action: TR-8 Permit/Job#: M1979089 <br /> PROJECT IDENTIFICATION <br /> Task#: 10A State: Colorado Abbreviation: None <br /> Date: 5/16/2022 County: Mesa Filename: M089-10a <br /> User: ACY <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $21.28 $37.94 $47.67 <br /> Operating Cost/Hour: $26.55 $50.48 $56.21 <br /> Operator Cost/Hour: $20.54 $20.54 $20.54 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $68.37 $132.49 $147.95 <br /> NON ROADABLE EQUIPMENT, <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> Submersible pump 0.70 $14.98 $68.37 3 $250.05 $205.11 $250.00 <br /> -460v,8 in. <br /> Cat 627G w/push- 43.48 $188.81 $132.49 4 $1,285.20 $529.96 $1,000.00 <br /> pull <br /> Cat D8T-8SU 47.71 $97.46 $132.49 2 $459.90 $264.98 $500.00 <br /> CATPS-150C 5.39 $45.37 $68.37 1 $113.74 $68.37 $250.00 <br /> (2004) <br /> CAT 972H 28.00 $60.09 $132.49 1 $192.58 $132.49 $250.00 <br /> Drill/Broadcast 25.00 $7.98 $68.37 1 $76.35 $68.37 $250.00 <br /> Seeder with <br /> Tractor <br /> Power Mulcher 6.00 $14.98 $68.37 1 $83.35 $68.37 $250.00 <br /> (Bowie LD-90) <br /> Subtotals: $2,461.17 $1,337.65 $2,750.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet CosVhr/fleet <br /> Water Tanker,2,500 Gal. $57.93 1 $57.93 $57.93 <br /> Flatbed Truck,4x2,30K GVW $58.13 1 $58.13 $58.13 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.