My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-26_REVISION - M1979089
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979089
>
2022-05-26_REVISION - M1979089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2022 10:46:46 AM
Creation date
5/26/2022 10:29:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979089
IBM Index Class Name
Revision
Doc Date
5/26/2022
Doc Name
Adequacy Review Response #2
From
DRMS
To
Jim Doody - Grand Junction Pipe & Supply CO
Type & Sequence
TR8
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Updated per TR-Figures provided <br /> Site: 23 Road Pit Permit Action: TR-8 Permit/Job#: M1979089 <br /> PROJECT IDENTIFICATION <br /> Task#: ACY State: Colorado Abbreviation: None <br /> Date: 5/16/2022 County: Mesa Filename: M089-ACY <br /> User: ACY <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> Ola Remove Structures and Debris from site DEMOLISH 1 8.00 $1,246 <br /> 02a Pond 2-Dewater prior to slope grading PUMPING 1 35.61 $5,469 <br /> 02b Pond 2-Grade slopes to 31-1:1V DOZER 2 4.40 $2,071 <br /> 02c Pond 2-Transport topsoil LOADER 1 14.69 $2,308 <br /> 02d Pond 2-Grade half of transported topsoil DOZER 2 0.39 $186 <br /> 02e Pond 2-Reveg REVEGE 1 2.00 $4,904 <br /> 03a Pond 3 -Dewater prior to slope grading PUMPING 1 38.86 $5,967 <br /> 03b Pond 3 -Grade slopes to 31-1:1V DOZER 2 2.35 $1,106 <br /> 03c Pond 3 -Transport topsoil LOADER 1 13.68 $2,150 <br /> 03d Pond 3 -Grade half of transported topsoil DOZER 2 0.37 $173 <br /> 03e Pond 3 -Reveg REVEGE 1 2.00 $4,616 <br /> 04a Pond 4-Dewater prior to slope grading PUMPING 1 80.68 $12,388 <br /> 04b Pond 4-Grade slopes to 31-1:1V DOZER 2 53.04 $24,943 <br /> 04c Pond 4-Transport topsoil LOADER 1 59.40 $9,331 <br /> 04d Pond 4-Grade half of transported topsoil DOZER 2 1.59 $749 <br /> 04e Pond 4-Reveg REVEGE 1 2.00 $20,194 <br /> 05a Decompact stockpile area RIPPER 2 20.12 $10,474 <br /> 05b Transport topsoil of stockpile area LOADER 1 195.68 $30,737 <br /> 05c Grade half of transported topsoil for stockpile area DOZER 2 5.72 $2,689 <br /> 05d Reveg stockpile area REVEGE 1 40.00 $59,157 <br /> 06a Plant trees REVEGE 1 30.00 $2,318 <br /> 10a Initial Mobilization MOBILIZE 1 2.50 $11,431 <br /> 10b Secondary Mobilization MOBILIZE 1 2.50 $1,438 <br /> SUBTOTALS: 615.58 $216,045 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $4,364 <br /> Performance bond: 1.05 Total= $2,268 <br /> Job superintendent: 230.00 Total= $16,567 <br /> Profit: 10.00 Total= $21,604 <br /> TOTAL O&P= $44,804 <br /> CONTRACT AMOUNT(direct+O&P)= $260,849 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br />
The URL can be used to link to this page
Your browser does not support the video tag.