Laserfiche WebLink
to a lower 80% confidence limit of 91 that surpasses 90% of the technical standard when the reverse null <br /> ranked"L"test is utilized (Chart 7). A total of 341 trees, shrubs, and sub-shrubs per acre were sampled in <br /> 2021 surpassing the woody plant density success criterion of 90 per acre (90% of the technical standard <br /> value of 100 woody plants per acre). <br /> Chart 5 <br /> Bowie #1 - West Mine - 2019 &2021 <br /> 90 Total Plant Cover(%Average Cover) <br /> d <br /> 80 <br /> 70 79.8 <br /> c 60 <br /> ------- -----� <br /> � 50 54.6 54.0 <br /> 40 <br /> 30 <br /> a 20 <br /> 10 <br /> V <br /> N � <br /> a 2019 2021 Success Criterion <br /> Chart 6 <br /> Bowie #1 - West Mine - 2019 & 2021 <br /> Total Annual Herbaceous Production (lbs./ acre) <br /> a 1,200 <br /> L <br /> a. <br /> .-. 1,000 1,089 <br /> G 800 <br /> 3 600 <br /> 0 <br /> a 549 <br /> p 405 <br /> c 200 <br /> d <br /> d 0 <br /> 2019 2021 Success Criterion <br /> Chart 7 <br /> Bowie #1 - West Mine - 2019 & 2021 <br /> c Woody Plant Density(Young and Mature/ acre) <br /> 400 <br /> s 350 366 <br /> 300 341 <br /> t'n y 250 <br /> R a 200 <br /> 150 <br /> 3 <br /> rs`n 100 ______� --_____� <br /> vi 50 90 <br /> d <br /> d 0 -- <br /> 2019 2021 Success Criterion <br /> CEDAR CREEK ASSOCIATES, Inc. 17 Bowie #1 Mine-West Mine - 2021 <br /> Phase III Bond Release Evaluation <br />