Laserfiche WebLink
Scraper Worksheet Cont'd Task#02A Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Regrade Ag field slope <br /> Site: 32 Road Pit Permit Action: 05-2022 Permit/Job#: M1985219 <br /> PROJECT IDENTIFICATION <br /> Task#: 02A State: Colorado Abbreviation: None <br /> Date: 5/16/2022 County: Mesa Filename: M219-02a <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G w/push-pull <br /> -Dozer: NA <br /> Support Equipment-Load Area: Cat D8T-8SU <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: Water Tanker,3,500 Gal. <br /> Cost Breakdown: Scraper Work Team Support E ui ment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA 50 50 NA 50 <br /> Ownership cost/hour: $223.48 NA $97.46 $97.46 NA $17.15 <br /> Operating cost/hour: $193.77 NA $48.82 $48.82 NA $14.60 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA NA $0.00 $0.00 NA $0.00 <br /> Ripper op.cost/hour: NA NA $0.00 $0.00 NA $0.00 <br /> Operator cost/hour: $47.07 NA $40.04 $40.04 NA $0.00 <br /> Unit Subtotals: $464.32 NA $186.31 $186.31 NA $31.75 <br /> Number of Units: 4 0 1 1 0 1 <br /> Group Subtotals: Work: $1,857.28 Support: $372.62 Maint: $31.75 <br /> Total work team cost/hour: $2,261.65 <br /> MATERIAL QUANTITIES <br /> Initial volume: 3,988 CCY Swell factor: 1.125 <br /> Loose volume: 4,487 LCY <br /> Source of estimated volume: 330' of 15'H vert slope <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,550 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Earth-Dry packed Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 32.00 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />