Laserfiche WebLink
M1985-219 <br /> May 17, 2022 <br /> Page 2 <br /> 5000LF x 115ft= 13.20 ac @ 3" = 5324 CY <br /> 03c Reveg Reveg all slopes with dryland mix <br /> 04a Scrapper Apply overburden to pit floor <br /> 20 ac @ 20" = 56, 446 ac transported 400 LF <br /> 04b Scraper Apply topsoil to pit floor <br /> 20 ac @ 3" = 8067 cy transported 400 LF <br /> 04c Reveg Reveg pit floor w/alfalfa <br /> 05a Mob Initial Mobilization <br /> 05b Mob Secondary Mobilization <br /> Please feel free to contact me with any further questions. Amy Yeldell at the Division of <br /> Reclamation, Mining and Safety, Rm 215, 1001 E 62nd Ave, Denver CO 80216. Direct <br /> contact can be made by phone at 303-866-3567 Ext 8183 or via email at amy.yeldell@ <br /> state.co.us <br /> Sincerely, <br /> A�r�� <br /> Amy Yeldell <br /> Environmental Protection Specialist <br /> Ec: <br /> Travis Marshall, Senior EPS, Grand Junction DRMS <br /> Page 2 of 2 <br />