Laserfiche WebLink
Mobilization Worksheet Cont'd Task#05A Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: GRAND JUNCTION <br /> Total one-way travel distance: 4.00 miles <br /> Average Travel Speed: 30.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $9,075.01 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** $88.49 <br /> **one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.13 0.13 <br /> Return Time(Hours): 0.13 0.13 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 1.27 0.27 <br /> JOB TIME AND COST <br /> Total job time: 2.53 Hours <br /> Totaljob cost: $9,164 <br /> CIRCES Cost Estimating Software <br />