6.4.5 Reclamation Plan and Schedule <br /> Since the proposed amendment is to expand the mining operation in all <br /> directions from the current site reclamation will not take place until Phase <br /> III of the mining plan is completed. As each phase is completed the slopes <br /> will begin at highest existing ground level in ear area and extend down to the <br /> mining floor at a slope of 3H:IV. Once a slope is completed it will have the <br /> stockpiled topsoil placed on the slope and seeding will be done. <br /> Phase III will have slopes on the east wall once mining is completed to the <br /> east boundary. <br /> Phase IV will have slopes on the east and north that will be reclaimed when <br /> the mining is completed to those boundaries. <br /> When Phase V is completed the north and west slopes will be reclaimed to <br /> those respective boundaries. <br /> Phase VI will have slopes on the west side other than the area where the <br /> existing draw is in the land. <br /> Phase VU will daylight to the south leaving only a small portion of slope to <br /> be reclaimed on the east and west sides of this Phase. <br /> The mining plan for the expanded area is estimated to begin in late 2022 in <br /> Phase III and is estimated to take approximately 3 years to complete making <br /> the first reclamation on the slopes to begin in late 2024. However as each <br /> Phase in both the existing pit and the amended area are completed the floor <br /> of the pit will be leveled and sloped for drainage. The land has a natural <br /> draw on the west side of the mining area and all drainage will be sloped to <br /> that side. <br /> The entire mining area will be seeded with native grasses for pastureland <br /> once the mine is completed. <br /> Per the original permitting process the road constructed across the Pickering <br /> Family LLC property from County Road 61 to the gravel pit will be a <br /> permanent access to the 100 acre parcel also owned by Pickering Family <br /> LLC. This road will not be reclaimed upon completion of the gravel pit <br /> operation. <br />