My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-18_REVISION - M1991079
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991079
>
2022-05-18_REVISION - M1991079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2022 10:44:48 AM
Creation date
5/19/2022 9:49:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991079
IBM Index Class Name
Revision
Doc Date
5/18/2022
Doc Name
Notice of Surety Increase
From
DRMS
To
Elam Construction, Inc
Type & Sequence
SI2
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#04A Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Grade backfill material <br /> Site: Mule Farm Gravel Pit Permit Action: 04-2022 Permit/Job#: M1991079 <br /> PROJECT IDENTIFICATION <br /> Task#: 04A State: Colorado Abbreviation: None <br /> Date: 5/5/2022 County: Mesa Filename: M079-04a <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $97.46 NA <br /> Operating Cost/Hour: $97.63 100 <br /> Ripper own.Cost/Hour: $0.00 NA <br /> Ripper op.Cost/Hour: $0.00 1 0 <br /> Operator Cost/Hour: $40.04 NA <br /> Total unit Cost/Hour: $235.13 <br /> Total Fleet Cost/Hour: $235.13 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 11,778 <br /> Swell factor: 1.000 <br /> Loose volume: 11,778 LCY <br /> Source of estimated volume: Half of transported Vol-23,555 <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly production: 1,400.0 LCY/hr <br /> Materials consistency description: Loose stockpile 1.2 <br /> Average push gradient: -5% <br /> Average site altitude: 4,600 feet <br /> Material weight: 2,900 lbs/LCY <br /> Weight description: Sand and gravel-Dry <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.200 (CAT HB) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.