My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-18_REVISION - M1991079
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991079
>
2022-05-18_REVISION - M1991079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2022 10:44:48 AM
Creation date
5/19/2022 9:49:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991079
IBM Index Class Name
Revision
Doc Date
5/18/2022
Doc Name
Notice of Surety Increase
From
DRMS
To
Elam Construction, Inc
Type & Sequence
SI2
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Post inspection update <br /> Site: Mule Farm Gravel Pit Permit Action: 04-2022 Permit/Job#: M1991079 <br /> PROJECT IDENTIFICATION <br /> Task#: ACY State: Colorado Abbreviation: None <br /> Date: 5/5/2022 County: Mesa Filename: M079-ACY <br /> User: ACY <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 01a Demo DEMOLISH 1 8.00 $5,669 <br /> 02a Dewater pond for grading PUMPING 1 344.89 $29,592 <br /> 03a Transport overburden for backfill and grading SCRAPERI 1 23.62 $27,486 <br /> 04a Grade backfill material DOZER 1 15.92 $3,744 <br /> 05a Rip compacted areas RIPPER 1 9.65 $2,514 <br /> 06a Transport topsoil SCRAPERI 1 21.31 $24,796 <br /> 07a Grade topsoil DOZER 1 15.07 $3,544 <br /> 08a Reveg pond slopes Approx.3 ac REVEGE 1 8.00 $1,719 <br /> 09a Reveg flat areas Approx. 16.5 ac REVEGE 1 24.00 $10,930 <br /> 10a Initial Mobilization MOBILIZE 1 2.57 $7,021 <br /> 1la Secondary Mobilization MOBILIZE 1 2.57 $1,402 <br /> SUBTOTALS: 475.6 $118,417 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $2,392 <br /> Performance bond: 1.05 Total= $1,243 <br /> Job superintendent: 70.35 Total= $5,067 <br /> Profit: 10.00 Total= $11,842 <br /> TOTAL O&P= $20,544 <br /> CONTRACT AMOUNT(direct+O&P)= $138,961 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 0.00 Total= $0 <br /> Reclamation management and/or administration: 5.00 $6,948 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $27,992 <br /> TOTAL BOND AMOUNT(direct+indirect)= $146,409 <br />
The URL can be used to link to this page
Your browser does not support the video tag.