My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-18_REVISION - M1981243
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981243
>
2022-05-18_REVISION - M1981243
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2022 10:35:45 AM
Creation date
5/19/2022 9:47:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981243
IBM Index Class Name
Revision
Doc Date
5/18/2022
Doc Name
Notice of Surety Increase
From
DRMS
To
Grand Junction Concrete Pipe CO
Type & Sequence
SI6
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: 2022 Post Inspection Update <br /> Site: South Fruita Gravel Pit Permit Action: 2022 Permit/Job#: M1981243 <br /> PROJECT IDENTIFICATION <br /> Task#: ACY State: Colorado Abbreviation: None <br /> Date: 5/4/2022 County: Mesa Filename: M243-ACY <br /> User: ACY <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Descri tion Used Size Hours Cost <br /> South Karp <br /> Ola Push riprap into pond DOZER 1 24.02 $6,084 <br /> 02a Reveg S.Karp pond stockpile area REVEGE 1 12.00 $11,217 <br /> North Karp <br /> 03a Dewater Karp Pond PUMPING 1 94.85 $13,927 <br /> 04a Grade N.Karp Pond Highwalls DOZER 1 20.24 $5,127 <br /> 05a Rip stockpile/processing area of N.Karp Pond RIPPER 1 14.80 $3,853 <br /> 06a Place 6"topsoil over N.Karp Pond area SCRAPERI 1 19.31 $24,749 <br /> 07a Reveg N.Karp Pond REVEGE 1 20.00 $27,532 <br /> Arcuby <br /> 08a Dewater Arcuby Pond PUMPING 1 161.34 $19,134 <br /> 10a Grade Arcuby Pond Highwalls DOZER 1 8.68 $2,198 <br /> 1 la Rip stockpile/processing area of Arcuby Pond RIPPER 1 21.81 $5,678 <br /> 12a Place 6"topsoil over Arcuby Pond area SCRAPERI 1 24.03 $30,799 <br /> 13a Reveg Arcuby Pond REVEGE 1 32.00 $34,262 <br /> 14a Initial Mobilization MOBILIZE 1 2.88 $7,313 <br /> 15a Secondary Mobilization MOBILIZE 1 2.88 $1,473 <br /> SUBTOTALS: 458.84 $193,346 <br />
The URL can be used to link to this page
Your browser does not support the video tag.