My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-18_REVISION - M1981243
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981243
>
2022-05-18_REVISION - M1981243
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2022 10:35:45 AM
Creation date
5/19/2022 9:47:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981243
IBM Index Class Name
Revision
Doc Date
5/18/2022
Doc Name
Notice of Surety Increase
From
DRMS
To
Grand Junction Concrete Pipe CO
Type & Sequence
SI6
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mobilization Worksheet Cont'd Task 4 14A Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: GRAND JUNCTION, <br /> CO <br /> Total one-way travel distance: 10.00 miles <br /> Average Travel Speed: 45.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $7,291.02 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** $21.66 <br /> **one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.22 0.22 <br /> Return Time(Hours): 0.22 0.22 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 1.44 0.44 <br /> JOB TIME AND COST <br /> Total job time: 2.89 Hours <br /> Total job cost: $7,313 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.